Streets: Rothesay Avenue 
Date: Starting Monday, May 20, 2019
Duration: Five (5) days
Time: 7 a.m. - 7 p.m. 
Direction:Traffic will be reduced to two lanes between McLean Street and McAllister Drive in both directions
Description of Work: Asphalt resurfacing 

Updated, May 16, 2019

 

Streets: Manawagonish Road 
Date: Friday, May 17 and Monday, May 20, 2019
Duration: Two (2) days 
Time: 7 a.m. – 7 p.m. 
Direction: Traffic will be reduced to one lane between Westgate Drive and Fairville Boulevard in both directions 
Description of Work: Asphalt resurfacing

Updated May 13, 2019

Streets: Duck Cove Lane 
Date: Thursday, May 16, 2019
Duration: One (1) day 
Time: 8 a.m. - 6 p.m.
Direction: Road will be closed to thru traffic at entrance to Duck Cove Lane in both directions
Description of Work: Infrastructure installation/upgrades

----------

Streets:
John T. McMillan Avenue 
Date: Tuesday, May 21 to Tuesday, June 18, 2019
Time: 7:00 a.m. to 7 p.m.
Duration: Four (4) weeks
Direction: At times, traffic will be reduced to one lane with traffic control
Specific Area: John T. McMillan Avenue, between Belgian Road and Golden Grove Road
Description of Work: Port City Water Partners will be completing intermittent asphalt works over the next 4 weeks, as part of the construction phase of the City of Saint John’s Safe, Clean Drinking Water Project

----------

Streets: John T. McMillan Avenue/Golden Grove Road
Date: Tuesday, May 21 to Tuesday, June 18, 2019
Time: 7:00 a.m. to 7:00 p.m.
Duration: Four (4) weeks
Direction: At times, traffic will be reduced to one lane with traffic control
Specific Area: John T. McMillan Avenue/Golden Grove Road intersection
Description of Work: Port City Water Partners will be completing intermittent asphalt works over the next 4 weeks, as part of the construction phase of the City of Saint John’s Safe, Clean Drinking Water Project

----------

Streets: Mountain Road/Morley Crescent 
Date: Tuesday, May 21 to Tuesday, June 18, 2019
Time: 7:00 a.m. to 7:00 p.m.
Duration: Four (4) weeks
Direction: At times, traffic will be reduced to one lane with traffic control
Specific Area: Mountain Road/Morley Crescent intersection
Description of Work: Port City Water Partners will be completing intermittent asphalt works over the next 4 weeks, as part of the construction phase of the City of Saint John's Safe, Clean Drinking Water Project 

----------

Streets: Glengarry Drive/Elgin Road
Date: Tuesday, May 21 to Tuesday, June 18, 2019
Time: 7:00 a.m. to 7 p.m.
Duration: Four (4) weeks
Direction: At times, traffic will be reduced to one lane with traffic control
Specific Area: Glengarry Drive/Elgin Road intersection
Description of Work: Port City Water Partners will be completing intermittent asphalt works over the next 4 weeks, as part of the construction phase of the City of Saint John's Safe, Clean Drinking Water Project 

----------

Streets: Westmorland Road 
Date: Tuesday, May 21 to Tuesday, June 18, 2019
Time: 7:00 a.m. to 7 p.m.
Duration: Four (4) weeks
Direction: At times, traffic will be reduced to one lane with traffic control
Specific Area: Westmorland Road between Mountain Road and Glengarry Drive
Description of Work: Port City Water Partners will be completing intermittent asphalt works over the next 4 weeks, as part of the construction phase of the City of Saint John's Safe, Clean Drinking Water Project 

----------

Streets: Intersection of Golden Grove Road/John T. McMillan Avenue
Date: Starting Tuesday, May 21 to June 11 , 2019
Time: 7:00 a.m. - 7:00 p.m.
Duration: Three (3) weeks
Direction: Traffic will be reduced to one lane in both directions, maintaining traffic standards using lights, signage and flaggers as appropriate. Traffic lights will be operational during non-construction hours
Specific Area: Golden Grove Road and John T. McMillan Avenue intersection
Description of Work: Port City Water Partners will be doing construction work to install new water transmission mains, as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

----------

Streets:
• Hickey Road from Loch Lomond Road to the Loch Lomond Drinking Water Treatment Facility.
• Rothesay Avenue from Thorne Avenue to McLean Street
• McLean Street
• Loch Lomond Road from Foley Court to Courtenay Avenue
• Westmorland Street from Tisdale Lane to Sunnyside Avenue
• Bruce Lane
• Commerce Drive and Loch Lomond Road
• Champlain Drive
Date: Monday, May 6 to Sunday, June 30, 2019
Time: 7:00 a.m. – 7:00 p.m.
Duration: Eight (8) weeks
Direction: Two-way traffic will be slowed in both directions to allow for deficiency inspection/repairs. Flag personnel will be present during this activity
Specific Area: Description of Work: Port City Water Partners will be completing inspections/repairs as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project

Updated May 10, 2019

On behalf of the Department of Transportation and Infrastructure

Public Notice
Saint John Harbour Bridge
Reduced to one lane


The Department of Transportation and Infrastructure wishes to advise the motoring public that the Saint John Harbour Bridge, located on Route 1 will be restricted to one lane in each direction on Saturday, May 11 and Sunday, May 12 from 7 a.m. - 7 p.m. each day.

In addition, the Chesley Drive on and off ramps and the Main Street on ramp will be closed intermittently during the same period.

These lane closures are necessary to perform roadway maintenance.

Signage will be in place.

The Department apologizes for any inconvenience this may cause.

The Department reminds motorists to reduce speed and drive safely. 

Updated May 7, 2019

Streets: Rothesay Avenue 
Date: Wednesday, May 8, 2019
Duration: One (1) day 
Time: 7 a.m. - 5 p.m.
Direction: Traffic will be reduced to one lane between Retail Drive and McAllister Drive, west bound
Description of Work: Water main repairs

----------

Streets: Sand Cove Road 
Date: Thursday, May 9, 2019
Duration: One (1) day 
Time: 7 a.m. - 6 p.m.
Direction: Sections will be closed for short periods of time close to the intersection of Duck Cove Lane, east bound
Description of Work: Infrastructure installation/upgrades

Updated May 2, 2019

Street: Loch Lomond Road 
Date: Friday, May 3, 2019
Time: 8:30 a.m. - 12 noon
Duration: One (1) day 
Direction: Road will be closed to thru traffic in front of 57 Loch Lomond Road in both directions. Road closed signs will be posted at Westmorland Road and Jean Street.
Description of Work: Asphalt resurfacing

----------

Streets: 
Sydney Street
Date: Sunday, May 5, 2019
Duration: One (1) day 
Time: 7 a.m. - 11 a.m.
Direction: A marked detour will be in effect between Leinster Street and King Square North in both directions
Description of Work: Infrastructure installation/upgrades

----------

Streets: King Square South
Date: Sunday, May 5, 2019
Duration: One (1) day 
Time: 7 a.m. - 11 a.m.
Direction: A marked detour will be in effect between Charlotte Street and Sydney Street in both directions
Description of Work: Infrastructure installation/upgrades

----------

Streets: Princess Street
Date: Starting Tuesday, May 7, 2019
Duration: Two (2) days
Time: 8 a.m. - 5:30 p.m. 
Direction: Road will be closed to thru traffic between Charlotte Street and Sydney Street in both directions
Description of Work: Infrastructure installation/upgrades

----------

On behalf of Gateway Operations

Gateway Operations wishes to advise the public that beginning Thursday, May 9th, 2019, northbound traffic on the Main Street Viaduct will be temporarily redirected to the southbound lanes, with traffic in both directions being divided by delineators.

As a result, the westbound on-ramp at Exit 122 will also be closed with detour signage in place to direct traffic to Route 1.

These temporary changes will remain in place for approximately 4 months and are required as maintenance work continues on the bridge deck.

Pedestrians should also note that foot traffic may also be impacted.

We apologize in advance for any inconvenience this may cause.

Updated April 30, 2019

Street:  Milford Road 
Date: Wednesday, May 1, 2019
Time: 8 a.m. - 6 p.m.
Duration: One (1) day 
Direction: Traffic lights/flaggers will direct traffic in front of 211 Milford Road in both directions
Description of Work: Water service leak 

----------

Street: Sandy Point Road 
Date: Wednesday, May 1, 2019
Time: 8:30 a.m. - 2 p.m.
Duration: One (1) day 
Direction: Road will be closed to thru traffic in front of 497 Sandy Point Road in both directions. Road closed signs will be posted at MacLaren Boulevard and Samuel Davis Drive. Access to Hazen White-St. Francis School via Samuel Davis Drive.
Description of Work: Asphalt resurfacing

---------

Street: Commerce Drive 
Date: Tuesday, April 30, 2019
Time: 10 a.m. - 6 p.m.
Duration: One (1) day 
Direction: Traffic will be reduced to one lane between Consumers Drive and Loch Lomond Road in both directions
Description of Work: Asphalt resurfacing

----------

Street: Consumers Drive
Date: Tuesday, April 30, 2019
Time: 10 a.m. - 6 p.m.
Duration: One (1) day
Direction: Traffic will be reduced to one lane between mall entrance and Commerce Drive in both directions
Description of Work: Asphalt resurfacing

Updated April 29, 2019

Street: Westmorland Road 
Date: Starting Monday, April 29, 2019
Time: 12 p.m. - 8 p.m.
Duration: Two (2) days
Direction: Traffic will be reduced to two lanes between Consumers Drive and McAllister Drive in both directions
Description of Work: Asphalt resurfacing

Updated April 26, 2019

Street: Union Street
Date: Starting Monday, April 29, 2019
Time: 24 hours/day
Duration: Five (5) days
Direction: Traffic will be reduced to one lane in both directions at the intersection of Union Street and Wentworth Street
Description of Work: Infrastructure installation/upgrades

Updated April 25, 2019

Street: University Avenue
Date: Thursday, April 25, 2019
Time: 1 p.m. - 9 p.m.
Duration: One (1) day
Direction: A marked detour will be in effect between Varsity Street and Sandy Point Road, both east bound lanes closed
Description of Work: Asphalt resurfacing

Updated April 17, 2019

Street: Ellerdale Street
Date: Starting Tuesday, April 23, 2019
Time: 24 hours/day
Duration: Thirteen (13) weeks
Direction: Road will be closed to thru traffic between Valley Street and Margaret Street in both directions. The road will remain accessible to emergency service vehicles and local area residents.
Description of Work: Infrastructure installation/upgrades

Updated April 16, 2019

Street: Union Street
Date: Wednesday, April 17, 2019
Time: 8 a.m. - 12 p.m.
Duration: One (1) day
Direction: Road will be closed to thru traffic between Sydney Street and Charlotte Street in both directions
Description of Work: Asphalt resurfacing 

Updated April 12, 2019

Street:  City Road 
Date: Starting Tuesday, April 16, 2019
Time: 7 a.m. - 9 p.m. 
Duration: Two (2) days
Direction: Traffic will be reduced to two lanes close to the intersection of Marsh Street at civic number 397, right hand south bound lane closed
Description of Work: Building demolition 

Updated April 3, 2019

Street:  Prospect Street West
Date: Saturday, April 6, 2019
Time: 8 a.m. - 5:30 p.m.
Duration: One (1) day 
Direction: Road closed to thru traffic between Collins Street and Walnut Street in both directions
Description of Work: Infrastructure installation/upgrades

Updated March 7, 2019

Street:  South Market Street
Date: Friday, March 8, 2019
Time: 7 a.m. - 9 a.m.
Duration: One (1) day 
Direction: Road closed to thru traffic between Charlotte Street and Germain Street
Description of Work: Infrastructure installation/upgrades

Updated March 6, 2019

Street:  One Mile Overpass
Date: Thursday, March 7, 2019
Time: Starting at approximately 10 a.m. 
Duration: Approximately two hours
Direction: Expect intermittent delays in both directions
Description of Work: Snow removal

Updated February 26, 2019

Street:  Loch Lomond Road 
Date: Effective immediately 
Time: Until Wednesday, February 27, 2019 at 8 a.m. 
Direction: Road is closed to traffic between Westmorland Road and Courtenay Avenue in both directions. A marked detour will be in place
Description of Work: Water main break  

----------

Street:  Mount Pleasant Avenue East 
Date: Wednesday, February 27, 2019
Time: 8 a.m. - 5 p.m.
Duration: One (1) day 
Direction: A marked detour will be in effect between Bayside Drive and Belgrave Street in both directions 
Description of Work: Water service leak 

----------

Extension on behalf of the Department of Transportation and Infrastructure : The following public notice is extended until approximately March 31, 2019

 

On behalf of the Department of Transportation and Infrastructure

PUBLIC NOTICE REVERSING FALLS BRIDGE REDUCED TO ONE LANE

The Department of Transportation and Infrastructure wishes to advise the
motoring public that the Reversing Falls Bridge will be reduced to one lane
commencing at 9 a.m. on Tuesday, January 29, 2019. 

This lane reduction is expected to be approximately 10 days and is necessary to carry out maintenance on the structure. 

Signage will be in place.

This is part of the ongoing work of the Department of Transportation and
Infrastructure. 

The department reminds motorists to reduce speeds and drive safely.


Updated February 21, 2019

Street:  River Avenue
Date: Starting Thursday, February 21, 2019
Time: 24 hrs/day 
Duration: Ten (10) days
Direction: Road is closed to thru traffic at the intersection of Bayside Drive in both directions
Description of Work: Building demolition 

Updated February 20, 2019

Streets: Hickey Road
Date: Friday, February 22 to Friday, March 8, 2019
Time: 7:00 a.m. – 7:00 p.m.
Duration: Two (2) weeks
Direction: Two-way traffic will be slowed in both directions to allow for chamber inspection. Flag personnel will be present during this activity.
Specific area: From Grandview Avenue to Loch Lomond Road
Description of work: Port City Water Partners will be completing chamber inspections as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

----------

Streets: Rothesay Avenue
Date: Friday, February 22 to Friday, March 8, 2019
Time: 7:00 a.m. – 7:00 p.m.
Duration: Two (2) weeks
Direction: Two-way traffic will be slowed in both directions to allow for chamber inspection. Flag personnel will be present during this activity.
Specific area: From Thorne Avenue to Russell Street
Description of work: Port City Water Partners will be completing chamber inspections as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated February 19, 2019

Streets: Millidge Avenue, near civic number 815 and near Hill Heights Road 
Date: Tuesday, February 19, 2019
Time: Until work is complete 
Duration: One (1) day
Direction: Road closed in both directions. Flaggers will be present.
Specific area: Between Reed Street and Daniel Avenue
Description of work: Service repair

Updated January 28, 2019

 

Streets: Intersection of John T. McMillan Avenue/Golden Grove Road
Date: Thursday, January 31 to Thursday, February 7, 2019
Time: 7 a.m. - 7 p.m.
Duration: 7 days
Direction: Intermittent Hydro-vac work at Cold Brook Creek. Flaggers will be present.
Specific area: Intersection of John T. McMillan Avenue/Golden Grove Road
Description of work: Port City Water Partners will be doing exploratory Hydro-vac work as a phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated January 25, 2019 at 3:00 p.m.

Westmorland Road between McAllister Drive and Consumers Drive will reopen at 3:30 p.m.

East bound ramp 128 onto Ashburn Lake Road is open to access businesses up to the train tracks behind Deluxe. No thru traffic is permitted.

Lower section of Golden Grove Road near civic number 108 is closed.

Lower section of Dresden Avenue is closed.

There is currently no status change to the following locations:

Sections of McAllister Drive remain closed from Westmorland Road to Rothesay Avenue. Barricades are located in front of Michael’s.

The Glen Falls area is still flooded and many roads are impassable.

Rothesay Avenue remains closed from Rothesay Road to the One Mile Interchange.

The East bound ramp from highway 1 to Rothesay Road/Rothesay Avenue is closed.

The West bound ramp 129 (Rothesay Avenue/Rothesay Road) is closed.

Ashburn Road is closed from Rothesay Road to Foster Thurston Drive.

Updated January 25, 2019 at 1:15 p.m.

  • Red Head Road at the break water has reopened.
  • Westmorland Road between McAllister Drive & Consumers Drive remains down to two lanes.
  • Sections of McAllister Drive remain closed from Westmorland Road to Rothesay Avenue.
  • The Glen Falls area is still flooded and many roads are impassable.
  • Rothesay Avenue remains closed from Rothesay Road to the One Mile Interchange.
  • The East bound ramp from highway 1 to Rothesay Road/Rothesay Avenue is closed.
  • Ashburn Road is closed from Rothesay Road to Foster Thurston Drive.
---------- On behalf of the Department of Transportation and Infrastructure

Updated February 11, 2019

This is extended until March 1, 2019

PUBLIC NOTICE REVERSING FALLS BRIDGE REDUCED TO ONE LANE The Department of Transportation and Infrastructure wishes to advise the motoring public that the Reversing Falls Bridge will be reduced to one lane commencing at 9 a.m. on Tuesday, January 29, 2019. This lane reduction is expected to be approximately 10 days and is necessary to carry out maintenance on the structure. Signage will be in place. This is part of the ongoing work of the Department of Transportation and Infrastructure. The department reminds motorists to reduce speeds and drive safely.

Updated January 25, 2019 at 8 a.m.

 

Westmorland Road between McAllister Drive & Consumers Drive, down to two lanes.
McAllister Drive is closed from Westmorland Road to Rothesay Avenue.
The Glen Falls area has extensive flooding and many roads are impassable.
Rothesay Avenue is closed from Rothesay Road to the One mile interchange.
East bound ramp from highway 1 to Rothesay Road/Rothesay Avenue
West bound ramp 129 (Rothesay Avenue/Rothesay Road)
East bound ramp 128 on to Ashburn Lake Road 
Read Head Road at the break water is closed in both directions.
Ashburn Road is closed from Rothesay Road to Foster Thurston Drive

Other streets around the City have been impacted by flooding. More closures will be announced soon. Check back for updates.

Motorists should drive with caution, observe all barricades and avoid any flooded areas.

 

Updated January 21, 2019

Roads across the City are ice packed and slippery. Crews are working to clear roads and apply salt and sand as quickly and efficiently as possible. Priority 1 and 2 will be done first, followed by Priority 3 and 4. Click here for more information. Updated January 16, 2019

Streets: Sydney Street
Date: Starting Friday, January 18, 2019 at 4 p.m.
Duration: Nine (9) days
Time: 24/7
Direction: Closed to thru traffic. A marked detour will be in effect. 
Specific Area: Between Leinster Street and King Square South, North bound
Description of Work: Infrastructure installation / upgrades

----------

Streets: King Square South 
Date: Starting Friday, January 18, 2019 at 4 p.m.
Duration: Nine (9) days
Time: 24/7 
Direction: Closed to thru traffic. A marked detour will be in effect. 
Specific Area: Between Charlotte Street and Sydney Street, East bound
Description of Work: Infrastructure installation / upgrades

Updated January 15, 2019

 

On behalf of the Department of Transportation and Infrastructure

PUBLIC NOTICE
SAINT JOHN HARBOUR BRIDGE
WESTBOUND LANE
REDUCED TO ONE LANE
The Department of Transportation and Infrastructure wishes to advise the motoring public that the westbound lane of the Harbour Bridge will be reduced to one lane on Tuesday, January 15, 2019 from 10 a.m. to 4 p.m.

This lane closure is necessary to carry out maintenance on the bridge. Signage will be in place.

The Department of Transportation and Infrastructure apologizes for any inconvenience this may cause.

The department reminds motorist to reduce speed and drive safely.