Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage and drive safely. Work commencement and completion times are subject to change. Weather permitting.

Updated Tuesday, November 29, 2016

 

Street: Kennebecasis Drive

Date: Starting Wednesday, November 30, 2016

Time: 7 a.m. - 8 p.m.

Duration: One (1) week

Direction: Traffic lights/flaggers will direct traffic between Meadowbank Avenue and Beach Crescent in both directions 

Description of work: Infrastructure installation/upgrades 

Updated Thursday, November 24, 2016

Asphalt Repairs

Motorists are advised of the following traffic interruptions:

Starting Monday, November 28, 2016 lasting through approximately 3 weeks for all streets listed below

Streets: 

Glengarry Drive;

John T. McMillan Avenue from Golden Grove Road to Belgian Road;

Loch Lomond Road from McDonald Street to Westmorland Road;

Mountain Road;

Westmorland Road from Loch Lomond Road to Golden Grove Road.

Date: Starting Monday, November 28, 2016

Time: 7am-6pm Monday through Friday

Duration: Approximately 3 weeks

Direction: On occasion, traffic will be reduced to one lane in both directions.

Specific Area: As noted above

Description of Work: Port City Work Partners will be completing asphalt repairs over the next 3 weeks, as part of the Safe Clean Drinking Water Project (SCDWP).

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

_______________________________________________________

Exploratory Test Holes To Locate Utility Services

Starting November 28, lasting through December 22, 2016

Motorists are advised of the following traffic interruptions:


Streets: Rothesay Avenue and McLean Street, from Thorne Avenue to Spencer Street

Date: Starting Monday, November 28, 2016

Time: 7am-6pm, Monday through Friday

Duration: Approximately 3-1/2 weeks

Direction: On occasion, traffic will be reduced to one lane in both directions.

Specific Area: As noted above.

Description of Work: Port City Work Partners will be completing exploratory works over the next 3-1/2 weeks, locating existing utilities as part of the design phase of the Safe Clean Drinking Water Project (SCDWP).

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

Updated Thursday, November 17, 2016

On behalf of Gateway Operations

Temporary lane restrictions – Mill Street Underpass


Gateway Operations wishes to advise the public of planned bridge deck work scheduled on the Mill Street underpass in Saint John. Beginning Wednesday, November 16, 2016 the northbound lanes and southbound lanes will be reduced to a single lane. Both lane reductions will remain in place for approximately three weeks, alternating between inside and outside lanes while work is being completed.

Motorists are advised to adjust travel times as minor delays can be expected.

We apologize for any inconvenience this may cause.

Updated Thursday, November 10, 2016

Streets: Champlain Drive

Date: Starting Tuesday, November 15, 2016 to Friday, January 13, 2017

Time: Starting at 6:30 AM November 15, 2016

Duration: Approximately 2 months

Direction: Champlain Drive will be reduced to two lanes of traffic in either direction. One lane will be dropped to allow for heavy equipment to turn.

Specific Area: Close to the intersection of Champlain Drive and Loch Lomond Road.

Description of Work: Port City Water Partners will be completing construction work, installing a construction access road off Champlain Drive as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists should take caution when approaching the construction area as heavy truck traffic can be expected from November 15 until mid-January.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage and drive safely. Work commencement

and completion times are subject to change, weather permitting.

Updated Tuesday, November 2, 2016

Street: Sydney Street

Date: Starting Thursday, November 3, 2016

Time: 7 a.m. - Midnight

Duration: Two (2) days


Direction: Road is closed to thru traffic between Princess Street and King Square South.  Traffic personnel will be on site during the closure to assist motorists.  North bound. 

Description of work: Infrastructure installation/upgrades 

Updated Friday, October 28, 2016

Street: Hickey Road, from Latimore Lake Road to Loch Lomond Road

Date: Beginning November 1, 2016 and lasting through to the end of November

Duration: 1 Month

Direction: Hickey Road from Loch Lomond Road to Latimore Lake Road will be reduced to single lane traffic in strategic locations throughout the full length of Hickey Road. Traffic Control devices and personnel will be in place assisting with traffic flow. Emergency vehicle access to homes and businesses will be priority over general traffic.

Description of Work: Port City Water Partners will be installing curbs, sidewalks and paving as part of the City of Saint John’s Safe Clean Drinking Water Project.

The safety of the public and our construction crews is a priority. Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. 

Work commencement and completion times are subject to change. 

More information on the Safe Clean Drinking Water Project can be found on www.saintjohn.ca or by contacting Customer Service at 658-4455 / service@saintjohn.ca 
____________________________________________________________

On behalf of Gateway Operations

Temporary lane restrictions – Gilbert Street/Crown Street Underpass

Gateway Operations wishes to advise the public of planned bridge deck work scheduled on the Gilbert Street/Crown Street underpass in Saint John.

Beginning Monday, October 31, 2016 the northbound lanes and southbound lanes will be reduced to a single lane.

Both lane reductions will remain in place for approximately two weeks, alternating between inside and outside lanes while work is being completed.

Motorists are advised to adjust travel times as minor delays can be expected.

We apologize for any inconvenience this may cause.

Updated Thursday, October 27, 2016

Street: Kennebecasis Drive 

Date: Thursday, October 27, 2016

Time: 8 a.m. - 4 p.m.

Direction: Traffic lights/flaggers will direct traffic in front of 914 Kennebecasis Drive in both directions

Description of work: Road repair/reconstruction 
_____________________________________________________________

Street: Tippett Drive 

Date: Thursday, October 27, 2016

Time: 8 a.m. - 6 p.m.

Direction: Road is closed to thru traffic adjacent to Dominion Park Road and Green Head Road in both directions

Description of work: Asphalt resurfacing
______________________________________________________________

Streets: Intersections of Rothesay Avenue/McAllister Drive and 
Golden Grove Road/McAllister Drive

Date: Sunday, October 30, 2016

Time:
9 a.m. - 6 p.m.

Direction:
Traffic lights will be flashing or off at the intersections of Rothesay Avenue/McAllister Drive and Golden Grove Road/McAllister Drive.

Flaggers will be present at the intersection of Rothesay Avenue/McAllister Drive.

Description of work: Traffic light repairs

Updated Wednesday, October 26, 2016

Street: Lansdowne Avenue

Date: Thursday, October 27, 2016

Time: 8 a.m. - 1 p.m.

Direction: Road is closed between Wellesley Avenue and Metcalf Street. 

Motorists are encouraged to detour along Adelaide Street or Somerset Street.

Access to properties and businesses within this closed section will be maintained. 

Description of work: Asphalt resurfacing

____________________________________________________________

Starting Monday, October 31, 2016

Motorists are advised of the following traffic interruptions:


Streets: Commerce Drive 

Date: Starting Monday, October 31, 2016 

Time: 5 days, starting at 6:30 AM 

Duration: Approximately 5 days

Direction: Commerce Drive will be reduced to one lane of traffic travelling from Westmorland Road.

Specific Area: Close to the intersection of Commerce Drive and Loch Lomond Road.

Description of Work: Port City Water Partners will be completing construction work, installing curbs and sidewalks as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage and drive safely. Work commencement and completion times are subject to change. Weather permitting.
 

Updated Saturday, October 22, 2016

Fairville Boulevard is now open to traffic.

Fairville Boulevard (west) between Kierstead Road and Manawagonish Road has been closed due to flooding.

Please observe barricades and signage.

 

Updated Friday, October 21, 2016

Street: Lansdowne Avenue

Date: Monday, October 24, 2016

Time: 8 a.m. - 3 p.m.

Direction: Road is closed between Wellesley Avenue and Metcalf Street. 

Motorists are encouraged to detour along Adelaide Street or Somerset Street.

Access to properties and businesses within this closed section will be maintained. 

Description of work: Installation of a signalized crosswalk

Updated Thursday, October 20, 2016

Starting Monday, October 24, 2016

Motorists are advised of the following traffic interruptions:


Streets: Commerce Drive 

Date: Starting Monday, October 24, 2016 

Time: 4 Days, starting at 6:30 AM 

Duration: Approximately 4 days

Direction: Commerce Drive will be reduced to one lane of traffic travelling from Westmorland Road

Specific Area: Close to the intersection of Commerce Drive and Loch Lomond Road

Description of Work: Port City Water Partners will be completing construction work, installing curbs and sidewalks as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting. 

Updated Wednesday, October 19, 2016


Starting Thursday, October 20, 2016


Motorists are advised of the following traffic interruptions:

Streets: Gault Road and Pipeline Road West

Date: Starting Thursday, October 20 until December 23, 2016

Time: 8 a.m. - 6 p.m. daily

Duration: From Thursday, October 20 until December 23, 2016

Direction: Traffic will be reduced to one lane in both directions during construction periods

Specific Area: Gault Road intersection with Pipeline Road West

Description of Work: Port City Water Partners will be completing work, locating existing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting. 

Updated Tuesday, October 18, 2016

Street: Peters Street

Date: Tuesday, October 18, 2016

Time: 9:30 a.m. - 4 p.m.

Direction: Road is closed to thru traffic between Coburg Street and Waterloo Street in both directions

Description of work: Road repair/reconstruction 

Updated Monday, October 17, 2016

Exploratory Test Holes Utility Locates

Motorists are advised of the following traffic interruptions:

Starting Thursday, October 20, 2016 lasting through approximately 3 weeks for all streets listed below


Streets:

Glengarry Drive

John T. McMillan Avenue from Golden Grove Road to Belgian Road

Loch Lomond Road from McDonald Street to Westmorland Road

Mountain Road

Westmorland Road from Loch Lomond Road to Golden Grove Road

Date: Starting Thursday, October 20, 2016

Time: 7 a.m. - 6 p.m. Monday through Friday

Duration: Approximately 3 weeks

Direction: On occasion traffic will be reduced to one lane in both directions

Specific Area: As noted

Description of Work: Port City Work Partners will be completing exploratory works over the next 3 weeks, locating existing utilities as part of the design phase of SCDWP Safe Clean Drinking Water Project

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

Updated Friday, October 14, 2016

Reminder: On behalf of NB Southern Railway

New Brunswick Southern Railway Crossing Upgrades in West Side Saint John at Fairville Boulevard and Main Street West – October 15-17, 2016

N.B. Southern Railway advises the public that major crossing upgrades at Fairville Boulevard and Main Street West will commence on Saturday, October 15, 2016.

Main Street West will be closed at the rail crossing between 7 a.m. Saturday, October 15 until midnight on Sunday, October 16.

Fairville Boulevard will be closed from 7 a.m. Monday, October 17 until midnight.

Barricades, signage, and flagging staff will be present.

N.B. Southern Railway apologizes for any inconvenience to the public during these important upgrades to the rail line.

Please click here for public service advisory

Updated Tuesday, October 11, 2016

On behalf of NB Southern Railway

NB Southern Railway will be upgrading Simms Corner railway crossings between October 15 and October 17, 2016.

The following roads will be closed:

Main Street West railway crossing will be closed from 7 a.m. October 15 until 12 midnight October 16. 

The railway crossing on Fairville Boulevard will be closed from 7 a.m. October 17 until 12 midnight.  

NB Southern Railway apologizes for any inconvenience we have caused to the public.

Updated Thursday, October 6, 2016

On behalf of Gateway Operations

Extended to 9pm on Friday, October 21, 2016

Traffic Advisory - Temporary Ramp Closures – Exit 120 Westbound Off and On Ramps


Gateway Operations wishes to advise the motoring public that due to extensive additional deck repairs, the temporary ramp closures for both the westbound off and on ramps at Exit 120 (Market Place) will be extended to 9pm on Friday, October 21, 2016.

We apologize for any inconvenience this may cause.

Updated Tuesday, October 4, 2016

Street: Dever Road

Date: Wednesday, October 5, 2016

Time: 7:30 a.m. - 5 p.m.

Direction: A marked detour will be in effect between Greenhead Road and Greendale Crescent in both directions

Description of work: Sewerage system
______________________________________________________________________

Starting October 7, 2016

Motorists are advised of the following traffic interruptions:

Streets: Loch Lomond Road/Commerce Drive intersection 

Date: Starting Friday, October 7, 2016 

Time: 10 Days, starting at 6:30 AM 

Duration: approximately 10 days

Direction: The intersection at Commerce Drive and Loch Lomond Road will be closed to through traffic at all times from October 7 to October 16, 2016

Specific Area: Intersection at Commerce Drive and Loch Lomond

Description of Work: Port City Water Partners will be completing construction work, installing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorist are encouraged to find alternate routes around the intersection of Commerce Drive and Loch Lomond Road as the intersection will be closed for 10 days, day and night. Through traffic will not be permitted during this time frame. Detours will be noted through McAllister Drive, Westmorland Road, back onto Loch Lomond Road.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

Updated Friday, September 30, 2016

On behalf of Gateway Operations

Traffic Advisory – Near the intersection of Rothesay Avenue and City Road (Haymarket Square)

Gateway Operations wishes to advise the public of temporary lane restrictions and/or closures near the Haymarket Square intersection of Rothesay Avenue and City Road beginning Monday, October 3. The restrictions are required to enable crews to safely complete concrete repairs to the underside of the Gilbert Street/Crown Street underpass structure. The work is expected to take approximately three weeks to complete.

We apologize for the inconvenience this may cause.

Updated Thursday, September 29, 2016

On behalf of The Department of Transportation and Infrastructure

PUBLIC NOTICE
HARBOUR BRIDGE
REDUCED TO ONE LANE
IN BOTH DIRECTIONS


The Department of Transportation and Infrastructure wishes to advise the motoring public that on Sunday, October 2nd, 2016 from 8:00 am to
5:00 pm
the Harbour Bridge will be reduced to one lane in both directions. 
This work is expected to take 1 day to complete.  Signage will be in place.

The department wishes to remind motorists to reduce speeds and drive safely.

Please click here for public notice

Updated Wednesday, September 28, 2016
 

On behalf of Gateway Operations

Extended to 9pm on Friday, October 7, 2016

Traffic Advisory - Temporary Ramp Closures – Exit 120 Westbound Off and On Ramps

Gateway Operations wishes to advise the motoring public that due to required additional deck repairs, the temporary ramp closures for both the westbound off and on ramps at Exit 120 (Market Place) will be extended to 9pm on Friday, October 7, 2016.

We apologize for any inconvenience this may cause.
_____________________________________________________________

Street: Manawagonish Road

Date: Wednesday, September 28, 2016

Time: Until 3 p.m.

Directon: Road is closed between Coster Street and Catherwood Street in both directions

Description of work: Infrastructure installation / upgrades

Updated Tuesday, September 27, 2016

Street: Somerset Street

Date: Wednesday, September 28, 2016

Time: 9 a.m. - 4 p.m.

Direction: Traffic will be reduced to one lane between Pugsley Avenue and Churchill Boulevard North bound

Description of work: Sewerage system

Updated Friday, September 23, 2016

Street: Bradley Lake Road

Direction: Traffic will be reduced to one lane between Golden Grove Road and Watercrest Road until the morning of Monday, September 26, 2016.

Starting Monday morning, September 26, 2016 there will be no lanes open for local traffic 7 a.m. until 5 p.m. The road will then be re-opened.  

A marked detour will be in effect.

Description of work: Infrastructure installation/upgrades

Updated Tuesday, September 20, 2016

Street: Bradley Lake Road

Date: Starting Tuesday, September 20, 2016

Duration: Four (4) days

Direction: Traffic will be reduced to one lane between Golden Grove Road and Watercrest Road until the morning of Wednesday, September 21, 2016.

Starting Wednesday morning, September 21, 2016 there will be no lanes open for local traffic.

A marked detour will be in effect.

Description of work: Infrastructure installation/upgrades

____________________________________________________________

Street: Lorneville Road

Date: Wednesday, September 21, 2016

Time: 9 a.m. - 4 p.m.

Direction: Road is closed between School Bus Road and Mill Cove Lane.  A marked detour will be in effect.

Description of work: Infrastructure installation/upgrades
_____________________________________________________________

Traffic Advisory: Intersection of Loch Lomond Road and Commerce Drive

Starting September 23, 2016


Motorists are advised of the following traffic interruptions:

Streets: Loch Lomond Road/Commerce Drive intersection 

Date: Starting Friday, September 23, 2016 

Time: 9am-4pm 

Duration: approximately 1 day

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Intersection at Commerce Drive and Loch Lomond

Description of Work: Port City Water Partners will be completing exploratory work, locating existing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

__________________________________________________________

Traffic Advisory: Ocean Westway

Starting September 23, 2016


Motorists are advised of the following traffic interruptions:

Streets: Ocean Westway from King William Rd to Manawagonish Rd

Date: Starting Friday, September 23, 2016 until December 23, 2016

Time: 8am-6pm daily

Duration: From September 23, 2016 until December 23, 2016

Direction: Traffic will be reduced to one lane in both directions during construction periods

Specific Area: Ocean Westway to Manawagonish Rd

Description of Work: Port City Water Partners will be completing work, locating existing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

___________________________________________________________

 

Updated Monday, September 19, 2016

On behalf of The Department of Transportation and Infrastructure 

PUBLIC NOTICE
REVERSING FALLS BRIDGE
REDUCED TO ONE LANE

The Department of Transportation and Infrastructure wishes to advise the motoring public that starting at 9:00 a.m. on Tuesday, September 27th, 2016 there will be repairs to the Reversing Falls Restaurant, requiring the closure of one lane of the Reversing Falls Bridge.  This work is expected to take approximately 1 day to complete.  Signage and flaggers will be in place.

The department reminds motorists to reduce speeds and drive safely.

Please click here for public notice
____________________________________________________________

Street: Ellerdale Street 

Date: Monday, September 19, 2016

Time: All day

Direction: Road is closed between Rockcliffe Street and Saint Anne Street

Description of work: Infrastructure installation/upgrades
_____________________________________________________

Street:
 Bradley Lake Road

Date: Starting Tuesday, September 20, 2016

Time: 7 a.m. - 9 p.m.

Duration: Four (4) days

Direction: Road is closed to thru traffic between Golden Grove Road and Watercrest Road in both directions.  Road is open to local traffic. A marked detour will be in effect.

Description of work: Infrastructure installation/upgrades

Updated Wednesday, September 14, 2016

On behalf of Gateway Operations

Public Service Announcement
Temporary lane restrictions – Gilbert Street/Crown Street Underpass

Gateway Operations wishes to advise the public of planned bridge deck work scheduled on the Gilbert Street/Crown Street underpass in Saint John. Beginning Thursday, September 15, 2016 the northbound lanes will be reduced to a single lane and on Monday, September 19, 2016 the southbound lanes will also be reduced to a single lane. Both lane reductions will remain in place for approximately two weeks, alternating between inside and outside lanes while work is being completed.

Motorists are advised to adjust travel times as minor delays can be expected.

We apologize for any inconvenience this may cause.

___________________________________________________________

On behalf of Gateway Operations

Public Service Announcement - Monday, September 19, 2016 to Friday, September 30, 2016 - Temporary Ramp Closures – Exit 120 Westbound Off and On Ramps


Gateway Operations wishes to advise the motoring public of temporary ramp closures for both the westbound off and on ramps at Exit 120 (Market Place). The closures are expected to be in place for two weeks, beginning at 9am on Monday, September 19th, 2016 and ending at 9pm on Friday, September 30, 2016.

The public is encouraged to follow detour instructions and signage.

We apologize for any inconvenience this may cause.

Updated Tuesday, September 13, 2016

Street: Adelaide Street

Date: Wednesday, September 14, 2016

Time: 7 a.m. - 5 p.m.

Direction: Traffic lights/flaggers will direct traffic between Main Street and Victoria Street in both directions

Description of work: Asphalt resurfacing

Updated Friday, September 2, 2016

Street: Grandview Avenue

Date: Friday, September 2, 2016

Time: 8 a.m. - 8 p.m.

Direction: Sections will be closed for short periods of time between Boylan Road and Heather Way in both directions

Description of work: Asphalt resurfacing
_____________________________________________________


Street: Green Head Road

Date: Friday, September 2, 2016

Time: 8 a.m. - 4 p.m.

Direction: Road is closed to thru traffic between Balmoral Crescent and Russell Hill Road in both directions

Description of work: Road repair/reconstruction

Updated Wednesday, August 31, 2016

Traffic Advisory: Hickey Road 

Beginning September 6, 2016 and lasting through to the end of September


Motorists are advised of the following traffic interruption:

Street: Hickey Road, from Latimore Lake Road to Loch Lomond Road

Date: Beginning September 6 and lasting through to the end of September

Duration: 2 weeks

Direction: Hickey Road; between Heather Way and Sigma Street, will be periodically closed over the next 2 weeks. During the time frame when the road is closed, vehicles will be detoured around the work area through Kappa Avenue and Sigma Street, back onto Hickey Road. Traffic control personnel will be present to guide motorist through the detour as required.

Traffic Control devices and personnel will be in place assisting with traffic flow to Park Place Apartments. Emergency vehicle access to homes and businesses will be priority over general traffic.

Description of Work: Port City Water Partners will be installing new water transmission mains for the City of Saint John’s Safe Clean Drinking Water Project.

The safety of the public and our construction crews is a priority. Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. 

Work commencement and completion times are subject to change. 

More information on the Safe Clean Drinking Water Project can be found on www.saintjohn.ca or by contacting Customer Service at 658-4455 / service@saintjohn.ca 

Updated Tuesday, August 30, 2016

Street: Green Head Road

Date: Wednesday, August 31, 2016

Time: 8 a.m. - 6 p.m.

Direction: A marked detour will be in place between Balmoral Crescent and Russell Hill Road in both directions

Description of work: Water main repairs

Updated Monday, August 29, 2016

On behalf of Saint John Energy

The road in front of civic 33 Charlotte Street (Saint John City Market) will be reduced to one lane to upgrade underground infrastructure safely and to maintain pedestrian traffic.

The work will begin September 1st, 2016 and be completed October 10th, 2016.

For further information please call Saint John Energy at 658-5252.

Updated Friday, August 26, 2016

Traffic Advisory: Hickey Road 

Beginning September 1, 2016 and lasting through to the end of October

Motorists are advised of the following traffic interruption:

Street: Hickey Road, from Latimore Lake Road to Loch Lomond Road

Date: Beginning September 1, 2016 and lasting through to the end of October

Duration: 2 Months

Direction: Hickey Road from Loch Lomond Road to Latimore Lake Road will be reduced to single lane traffic in strategic locations throughout the full length of Hickey Road. Traffic Control devices and personnel will be in place assisting with traffic flow. Emergency vehicle access to homes and businesses will be priority over general traffic.

Description of Work: Port City Water Partners will be installing new water transmission mains for the City of Saint John’s Safe Clean Drinking Water Project.

The safety of the public and our construction crews is a priority. Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. 

Work commencement and completion times are subject to change. 

More information on the Safe Clean Drinking Water Project can be found on www.saintjohn.ca or by contacting Customer Service at (506)  658-4455 / service@saintjohn.ca 

_____________________________________________________________

Street: McAllister Drive

Date: Friday, August 26, 2016

Time: 8 a.m. - 3 p.m.

Direction: Sections will be closed for short periods of time between Majors Brook Drive and Westmorland Road East bound 

Description of work: Road repair/reconstruction

Updated Thursday, August 25, 2016

Street: Mount Pleasant Avenue (North)

Date: Friday, August 26, 2016

Time: 3 a.m. - 1 p.m.

Direction: Traffic will be reduced to one lane between Rocky Terrace and Crown Street Overpass in both directions

Description of work: Asphalt resurfacing

Updated Tuesday, August 23, 2016

Street: Forest Hill Drive

Date: Starting Tuesday, August 23, 2016

Time: 9 a.m. - 5 p.m.

Duration: Two (2) days

Direction: Road is closed to thru traffic at the intersection of Clearview Row to end in both directions

Description of work: Asphalt resurfacing

Updated Monday, August 22, 2016

Street: Manawagonish Road 

Date: Starting Monday, August 22, 2016

Time: All day

Duration: Two (2) days

Direction: Full closure. A marked detour will be in effect between Birch Street and Pickard Street in both directions

Description of work: Water main repairs

Updated Friday, August 19, 2016

On behalf of the Department of Transportation and Infrastructure

PUBLIC NOTICE
CONSTRUCTION & TRAFFIC DISRUPTIONS
REVERSING FALLS BRIDGE
CITY OF SAINT JOHN


The Department of Transportation and Infrastructure wishes to advise the motoring public that starting Monday, August 22nd, 2016 there will be maintenance taking place on the Reversing Falls Bridge, causing a change in traffic patterns.  This work is expected to take approximately 2 days, signage will be in place.

This is part of the ongoing work of the Department of Transportation and Infrastructure.  The department reminds motorists to reduce speeds and drive safely.

Please click here for public notice

Updated Wednesday, August 17, 2016

On behalf of the Department of Transportation and Infrastructure

PUBLIC NOTICE
SAINT JOHN HARBOUR BRIDGE (H290)
WESTBOUND (ROUTE 1)
ONE LANE CLOSURE

The Department of Transportation & Infrastructure wishes to advise the motoring public that the westbound lane of the Harbour Bridge (Route 1) will be reduced to one lane on Thursday, August 18, 2016, weather permitting. This lane closure is necessary to carry out routine maintenance on the bridge and will take approximately one day to complete.  Signage will be in place.  

The Department of Transportation & Infrastructure apologizes for any inconvenience this may cause.  The department reminds motorists to reduce speed and drive safely.

Please click here for public notice
_______________________________________________________

Updated Friday, August 12, 2016

Street: Coburg Street

Date: Starting Monday, August 15, 2016

Time: 7 a.m. - 7 p.m.

Duration: Three (3) days

Direction: Road is closed to thru traffic between Peters Street and Paddock Street.  A marked detour will be in effect. North bound. 

Description of work: Infrastructure installation/upgrades

___________________________________________________________


Street: 
Garden Street

Date: 
Starting Monday, August 15, 2016

Time: 
7 a.m. - 7 p.m.

Duration: 
Three (3) days

Direction: 
A marked detour will be in effect. Intersection of Garden Street and Coburg Street.  No left turns from Garden Street onto Coburg Street will be permitted.  South bound. 

Description of work: 
Infrastructure installation/upgrades

___________________________________________________

Street:
 Manawagonish Road 

Date: Tuesday, August 16, 2016

Time: 8 a.m. - 5 p.m.

Direction: A marked detour will be in effect between Birch Street and Pickard Street in both directions

Description of work: Sewerage System

___________________________________________________________

Marathon by the Sea

The organizers of the 2016 Emera Marathon by the Sea would like to advise residents and motorists that a number of traffic and safety plans have been put in place for this year’s event. The run will begin at the Diamond Jubilee Cruise Terminal at 8:00 a.m. on Sunday, August 14, and follow a mapped route across the City, leading back to the terminal for the finish line.  

Traffic interruptions:

One eastbound lane over the Harbour Bridge as well as the off ramp to Chesley Drive will be closed between 6:30 a.m. and 3:00 p.m. on Sunday, August 14. The speed limit in the one remaining eastbound lane in advance of and over the bridge will be reduced to 50KM/H. Marathon participants will run in the closed lane. 

Police and traffic control personnel will be stationed across the bridge, and at major intersections and access points along the race route to safely manage and redirect traffic.

Motorists should expect traffic delays, and are asked to drive with caution, and obey traffic signage, cones, and flaggers at all times. 

Visit www.marathonbythesea.com for a detailed race map. For more information, please contact the organizers of Marathon by the Sea. 

Updated Thursday, August 11, 2016

Street: Paradise Row

Date: Starting Thursday, August 11, 2016

Time: 12 p.m. - 9 p.m.

Duration: Two (2) days

Direction: Traffic will be reduced to two lanes in both directions

Description of work: Asphalt resurfacing 

Updated Tuesday, August 9, 2016

Street: Valleyview Crescent

Date: Starting Wednesday, August 10, 2016

Time: 8 a.m. - 6 p.m.

Duration: Two (2) days

Direction: Road is closed to thru traffic between Greendale Crescent and Mollins Drive in both directions

Description of work: Asphalt resurfacing 

____________________________________________________

Street:
 Thornbrough Street

Date: Wednesday, August 10, 2016

Time: 8 a.m. - 5 p.m.

Direction: Road is closed to thru traffic between Cranston Avenue and Anglin Drive in both directions. 

Description of work: Water main repairs

Updated Monday, August 8, 2016

Street: Coburg Street

Date: Starting Tuesday, August 9, 2016

Time: 7 a.m. - 7 p.m.

Duration: Four (4) days

Direction: Road is closed to thru traffic between Peters Street and Paddock Street.  A marked detour will be in effect.

Description of work: Infrastructure installation/upgrades (North bound)

Updated Wednesday, August 3, 2016

Street: Intersection of Margaret Street and Ellerdale Street

Date: Wednesday, August 3, 2016

Time: Until approximately 5:30 p.m.

Direction: Ellerdale Street is closed to thru traffic between Margaret Street and Saint Anne Street

Description of work: Water main repairs 

____________________________________________________________

Streets: Ocean Westway, between King William Road and Spruce Lake

Date: Starting Friday, August 5, 2016 

Time: 8am-6pm daily 

Duration: From August 5 to the first week of December

Direction: Traffic will be reduced to one lane in both directions

Specific Area: Intersection at King William Road and Ocean Westway to Spruce Lake

Description of Work: Port City Water Partners will be completing work, locating existing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

______________________________________________________________

Streets: Loch Lomond Road and Commerce Drive intersection 

Date: Starting Tuesday, August 9, 2016 

Time: 9am-4pm 

Duration: Approximately 1 day

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Intersection at Commerce Drive and Loch Lomond Road

Description of Work: Port City Water Partners will be completing exploratory work, locating existing water infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated Friday, July 22, 2016

Location: Rockwood Park

Date: Sunday, July 24, 2016

Time: Approximately 6 a.m. until 12 Noon 

Direction: Vehicles are able to enter Rockwood Park via either the main entrance or Hawthorne Avenue Extension.  No matter which entrance used, vehicles must exit via Hawthorne Avenue Extension as there will only be one way traffic when exiting the park.  This includes users of the Rockwood Park campground. 

Event: Rockwood By the Bay Triathlon

Motorists are advised to drive with extreme caution as there will be participants, volunteers and spectators in the park.

Updated Thursday, July 21, 2016

Streets: Chipman Hill

Date: Thursday, July 21, 2016

Time: All day

Direction: Road is closed to thru traffic

Description of work: Water main repairs

Flaggers will direct traffic. All parking garages are accessible as well as deliveries to Brunswick Square.

Updated Tuesday, July 19, 2016

Survey and Invert Collection - South Central Peninsula

Date: Tuesday, July 19, 2016

Duke Street from Canterbury Street to Water Street

Charlotte Street from St. James Street to Duke Street

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Monday, July 18, 2016

Streets: Road closure Pipeline Road West

Date: Starting Wednesday, July 20, 2016 to Tuesday, October 18, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 90 days

Direction: Pipeline Road (West) from Cullinan Avenue to Gault Road

Specific Area: Entire Road

Description of Work:
Port City Water Partners will be completing construction work over the next 90 days, installing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Access to local residents will be maintained at all times for local residents only. Through traffic will be detoured through Westgate Drive and onto Downsview Drive area.

___________________________________________________________

Survey and Invert Collection - South Central Peninsula

Date: Monday, July 18, 2016

Duke Street from Sydney Street to Water Street 

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Friday, July 8, 2016

Streets: End of Downsview Drive and intersecting with Pipeline Road West

Date: Starting Monday, July 11 to Wednesday, July 20, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 8 days

Direction: The section of Downsview Drive effected by this notification is at the location of the apartment buildings located at Pipeline Road (West)

Specific Area: Parking lot at the immediate end of Downsview Drive

Description of Work: Port City Water Partners will be completing construction work over the next 8 days, installing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated Tuesday, July 5, 2016

Street: Pitt Street

Date: Wednesday, July 6, 2016

Time: 8 a.m. - 4 p.m.

Direction: Road is closed to thru traffic between Leinster Street and Princess Street West bound 

Description of work: Asphalt resurfacing

Updated Monday, July 4, 2016

Street: Gault Road

Date: Tuesday, July 5, 2016

Time: 7 a.m. - 7 p.m.

Direction: Traffic will be reduced to one lane between Pipe Line Road West and Hayes Avenue in both directions

Description of work: Asphalt resurfacing

___________________________________________________

Street:
 Lansdowne Avenue

Date: Tuesday, July 5, 2016

Time: 8 a.m. - 5:30 p.m.

Direction: Traffic will be reduced to one lane between Visart Street and Wellesley Avenue in both directions

Description of work: Water main repairs

____________________________________________________________


Street:
Hickey Road, from Heather Way to Loch Lomond Road

Date: The road closure will begin on Thursday, July 7, 2016 and is expected to remain in effect until late August. 

Duration: Full road closure: days, nights, and weekends inclusive.

Direction: Hickey Road will be closed to through traffic, with the exception of local and emergency vehicle access to homes and businesses.

A detour will be established, routing traffic travelling east-bound Champlain Drive on to Grandview Avenue and Heather Way. 

Traffic traveling westbound will be detoured along Heather Way, Grandview Avenue and Champlain Drive. 

Description of Work: Port City Water Partners will be installing new water transmission mains for the City of Saint John’s Safe Clean Drinking Water Project.

Updated Thursday, June 30, 2016

Survey and Invert Collection - South Central Peninsula

Date: Thursday, June 30, 2016

Harding Street, Pagan Place and Queen Street.

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Wednesday, June 29, 2016

Street: Grandview Avenue

Date: Thursday, June 30, 2016

Time: 8 a.m. - 4:30 p.m.

Direction: Traffic will be reduced to one lane between Bayside Drive and Champlain Drive South bound.  Flaggers will direct traffic on Industrial Drive.

Description of work: Water main break

Updated Friday, June 24, 2016

Street: Loch Lomond Road

Date: Monday, June 27, 2016

Time: 7 a.m. - 7 p.m.

Direction: Traffic will be reduced to one lane between Churchland Road and Eldersley Avenue in both directions

Description of work: Asphalt resurfacing 

__________________________________________________________

Streets: Loch Lomond Road 

Date: Starting Monday, June 27 to Friday, July 8, 2016 

Time: 7am-6pm Monday through Friday 

Duration: Approximately 10 days 

Direction: On occasion, traffic will be reduced to one lane in both directions 

Specific Area: Loch Lomond Road, from the Mitsubishi dealership to the intersection at Westmorland Road 

Description of Work: Port City Water Partners will be completing exploratory work over the next 10 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

____________________________________________________________

Streets: Westmorland Road

Date: Starting Monday, June 27 to Friday, July 8, 2016

Time: 7am-6pm Monday through Friday

Duration: Approximately 10 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Westmorland Road from the intersection at Loch Lomond to the intersection at Golden Grove Road

Description of Work: Port City Water Partners will be completing exploratory work over the next 10 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated Thursday, June 23, 2016

Street: Loch Lomond Road

Date: Starting Thursday, June 23, 2016

Time: 7 a.m. - 7 p.m.

Duration: Two (2) days

Direction: Traffic will be reduced to one lane between Churchland Road and Eldersley Avenue in both directions

Description of work: Asphalt resurfacing 

Updated Tuesday, June 21, 2016

Street: St. Martins Road

Date: Starting Tuesday, June 21, 2016

Time: 7 a.m. - 7 p.m.

Duration: Three (3) days

Direction: Traffic will be reduced to one lane between Loch Lomond Road and Range Road in both directions

Description of work: Asphalt resurfacing 

__________________________________________________________

On behalf of Gateway Operations

Public Service Announcement for Saturday, June 25, 2016
Temporary Ramp Closures – Exit 123 Westbound Off and On Ramps


Gateway Operations wishes to advise the motoring public of temporary ramp closures of both the westbound off and on ramps at Exit 123 (Somerset Street/City Center.) The closures are expected to be in place starting at 6am on Saturday, June 25th, 2016 and will remain in place until 9pm that same day. Depending on weather conditions, the closure may be deferred to Sunday, June 26th, 2016.

The public is encouraged to use Exit 125 (Crown Street / One-Mile House) and follow detour instructions and signage.

We apologize for any inconvenience this may cause.

Updated Friday, June 17, 2016

Survey and Invert Collection - South Central Peninsula

Date: Friday, June 17, 2016

Elliott Row

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

__________________________________________________________

Street: Foster Thurston Drive 

Date: Starting Monday, June 20, 2016

Time: 7 a.m. - 7 p.m.

Duration: Two (2) days

Direction: Traffic will be reduced to one lane between Fieldstone Drive and Ashburn Road in both directions

Description of work: Asphalt resurfacing 

Updated Wednesday, June 15, 2016

Street: Foster Thurston Drive 

Date: Starting Thursday, June 16, 2016

Time: 7 a.m. - 7 p.m.

Duration: Two (2) days

Direction: Traffic will be reduced to one lane between Fieldstone Drive and Ashburn Road in both directions

Description of work: Asphalt resurfacing 

___________________________________________________________

Survey and Invert Collection - South Central Peninsula

Date: Thursday, June 16, 2016

King Street East and Elliott Row

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Friday, June 10, 2016

Streets: Hickey Road, from Loch Lomond Road to Heather Way

Date: Starting Monday, June 13 to Friday, June 17, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Hickey Road from the intersection at Loch Lomond Road through to the intersection at Heather Way

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project

___________________________________________________________

Streets: Downsview Drive, Pipeline Rd West, and Gault Road intersection with Pipeline Rd West

Date: Starting Monday, June 13 to Friday, June 17, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Downsview Drive at Pipeline Road West and Pipeline Road West to the Gault Road

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project

Updated Thursday, June 9, 2016

 

Street: McAllister Drive

Date: Saturday, June 11

Time: 6:00 AM - 3:00 PM

Direction: Traffic will be reduced to two lanes intersection of McAllister Drive and Westmorland Road in both directions

Description of work: Infrastructure installation / upgrades

___________________________________

Survey and Invert Collection - South Central Peninsula

Princess Street from Crown Street to Sydney Street and Sydney Street from Duke Street to Leinster Street

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

 

Updated Wednesday, June 8, 2016

 

Survey and Invert Collection - South Central Peninsula

Orange Street and Princess Street all between Crown Street and Sydney Street

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Tuesday, June 7, 2016

Street: Union Street

Date: Tuesday, June 7, 2016

Time: 12:30 p.m. - 5:30 p.m.

Direction: Road is closed to thru traffic between Sydney Street to Carmarthen Street Eastbound 

Description of work: Sewerage system

__________________________________________________________

Street: Main Street North

Date: Thursday, June 9, 2016

Time: 9 a.m. - 12 p.m.

Duration: 3 hours

Action: Section of road closed to thru traffic. Transit customers use Metcalf on McDonalds side for service to city centre.

Specific Area:
Lansdowne Avenue to Simonds Street

Direction: Both east and west bound
|
Description of work: Planting/Landscaping

Project: The Marigold Project www.marigolds.ca   

Updated Monday, June 6, 2016

 

On behalf of Gateway Operations

Public Service Announcement for Saturday, June 11, 2016
Temporary Ramp Closure – Exit 122 Westbound


Gateway Operations wishes to advise the motoring public of a temporary ramp closure to complete rehabilitation work, eastbound at Exit 120 (Market Place / Digby Ferry.) The ramp closure is expected to be in place starting at 6am on Saturday, June 11th, 2016 and will remain in place until 9pm that same day. Depending on weather conditions, the closure may be deferred to Sunday, June 12th, 2016.

The public is encouraged to use Exit 119 A-B eastbound and follow detour instructions and signage.

We apologize for any inconvenience this may cause.

Updated Friday, June 3, 2016

Survey and Invert Collection - South Central Peninsula

Sydney Street between St. James Street and Duke Street

Duke Street from Sydney Street to Crown Street

Mecklenburg Street from Sydney Street to Carmarthen Street

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. 

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

_____________________________________________________________

Streets: Hickey Road, from Loch Lomond Road to Heather Way

Date: Starting Monday, June 6 to Friday, June 10, 2016 

Time: 7 a.m. - 6 p.m. Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Hickey Road from the intersection at Loch Lomond Road through to the intersection at Heather Way

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

___________________________________________________________

Streets:
Downsview Drive, Pipeline Rd West, and Gault Road intersection with Pipeline Rd West

Date: Starting Monday, June 6 to June 10, 2016 

Time: 7 a.m. - 6 p.m. Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Downsview Drive at Pipeline Road West and Pipeline Road West to the Gault Road

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated Thursday, June 2, 2016

Street: Mountain View Drive

Date: Starting Thursday, June 2, 2016

Time: 10 a.m. - 5 p.m.

Duration: Two (2) days

Direction: Road is closed to thru traffic between Mountain Road and McAllister Drive in both directions

Description of work: Asphalt resurfacing 

____________________________________________________________

Survey and Invert Collection - South Central Peninsula

Carmarthen Street, Wentworth Street and Pitt Street all between St. James Street and Duke Street

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model.

Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

Updated Wednesday, June 1, 2016

Street: Gault Road

Date: Wednesday, June 1, 2016

Time: 7 a.m. - 7 p.m.

Direction: Traffic will be reduced to one lane between Hitachi Crescent and Hayes Avenue in both directions

Description of work: Asphalt resurfacing

Updated Tuesday, May 31, 2016

Street: Saint Patrick Street

Date:
Starting Wednesday, June 1, 2016

Duration:
Four (4) days

Direction:
Traffic will be reduced to one lane northbound. The use of an articulating lift/Zoom-Boom will be required blocking access to the sidewalk and one lane of traffic near the pedway

Description of work:
Repairs to City Hall/HSBC Bank building at pedway location

___________________________________________________


Street:
St. Martins Road

Date: Starting Tuesday, May 31, 2016

Time: 7 a.m. - 7 p.m. 

Duration: Two (2) days

Direction: Traffic will be reduced to one lane between City limits and Loch Lomond Road in both directions

Description of work: Asphalt resurfacing

Updated Monday, May 30, 2016


On behalf of the Department of Transportation and Infrastructure:

The Department of Transportation and Infrastructure will carry out routine inspections and maintenance on the Saint John Harbour Bridge between May 31 and June 3. 

This work will cause traffic disruptions. The planned traffic disruptions on the bridge include:

May 31 from 9 a.m. to 9 p.m. eastbound traffic will be reduced to one lane.

June 1 from 9 a.m. to 9 p.m. the Chesley Drive on-ramp and off-ramps will be temporarily closed to all traffic. When the on-ramp is closed the off-ramp will be open to traffic and when the on-ramp reopens the off-ramp will be closed to traffic.

June 2 from 9 a.m. to 9 p.m. westbound traffic will be reduced to one lane.

June 3 from 9 a.m. to 4:30 p.m. the Main Street ramp will be fully closed to all traffic. 

The department apologizes for the inconvenience and encourages motorists to drive safely. 

The public is encouraged to call 511 or visit the 511 website for updates for planned construction and maintenance activities.

__________________________________________________________

Street: Loch Lomond Road

Date: Starting Monday, May 30, 2016

Time: 12 p.m. - 7 p.m.

Duration: Two (2) days

Direction: Traffic will be reduced to one lane between Churchland Road and Eldersley Avenue in both directions

Description of work: Asphalt resurfacing

_________________________________________________________

Street: Union Street

Date: Starting Tuesday, May 31, 2016

Duration: Two (2) days

Direction: Road is closed to thru traffic between Waterloo Street and Carmarthen Street in both directions

Description of Work: Water main repairs

___________________________________________________________

Street: Mountain View Drive

Date: Starting Tuesday, May 31, 2016

Time: 8 a.m. - 4 p.m.

Duration: Two (2) days

Direction:  Sections will be closed for short periods of time between Mountain Road and McAllister Drive in both directions

Description of work: Asphalt resurfacing

Updated Thursday, May 26, 2016

Street: Foster Thurston Drive

Date:May-27-2016 07:00 AM - 7:00 PM 2 day(s)

Description of Work: Traffic will be reduced to one lane between Fieldstone Drive and Ashburn Road in both directions for asphalt resurfacing

___________________________________________________

Survey and Invert Collection-South Central Peninsula

Britain, Carmarthen and Pitt streets, between Broad and St. James streets.

This project involves the collection of sewer data by survey equipment and measurement for use in the continuing development of the City’s Sewer Model. Streets in the South Central Peninsula will experience closures on a block by block basis to facilitate the data collection.

 

 

Updated Wednesday, May 25, 2016

 

Street: Simpson Drive 

Date: May-25-2016 approximately 9:00 AM - 5:00 PM -- 1 day

Description of Work: Road is closed to thru traffic between Golden Grove Road and Tim Street for road repair

 

Updated Tuesday, May 24, 2016

Streets: Carmarthen Street

Date: May-25-2016 08:00 AM - 4:00 PM 1 day(s)

Description of Work: Road is closed to thru traffic between Duke Street and Mecklenburg Street in both directions for road repair

 

Updated Friday, May 20, 2016

Streets: Hickey Road, from Heather Way to Grandview Avenue / Latimore Lake Road

Date: The road closure will begin on Tuesday, May 24 and is expected to remain in effect until late August. 

Duration: Full road closure: days, nights, and weekends inclusive

Direction: Hickey Road will be closed to through traffic, with the exception of local and emergency vehicle access to homes and businesses.

A detour will be established, routing traffic traveling east-bound along Heather Way onto Grandview Avenue / Latimore Lake Road. 

Traffic traveling west-bound will be detoured along Grandview Avenue and Heather Way. 

Description of Work: Port City Water Partners will be installing new water transmission mains for the City of Saint John’s Safe Clean Drinking Water Project.

--------------------------------------------------

Streets: Hickey Road, from Loch Lomond Road to Heather Way

Date: Starting Monday, May 30 to Friday, June 3, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Hickey Road from the intersection at Loch Lomond Road through to the intersection at Heather Way

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City 

------------------------------------------------------

Streets: Downsview Drive, Pipeline Rd West, and Gault Road intersection with Pipeline Rd West

Date: Starting Monday, May 30 to Friday, June 3, 2016 

Time: 7am-6pm Monday through Friday

Duration: Approximately 5 days

Direction: On occasion, traffic will be reduced to one lane in both directions

Specific Area: Downsview Drive at Pipeline Road West and Pipeline Road West to the Gault Road

Description of Work: Port City Water Partners will be completing exploratory work over the next 5 days, locating existing infrastructure as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water Project.

Updated Thursday, May 19, 2016

 

Streets:  Carmarthen Street between Duke Street and Mecklenburg Street

Date: Friday, May 20, 2016 

Time: 8 a.m. - 4 p.m.


Direction:  Reduced to one lane South bound

Description of work:  Road repair/reconstruction

--------------------------------------------------

On behalf of Gateway Operations Gateway Operations wishes to advise the public of temporary lane restrictions on Route 1. Beginning Tuesday, May 24, 2016, traffic will be reduced to a single lane after 9am each day between km 115 and km 120 (west of the Saint John Harbour Bridge) in the eastbound direction. The restriction is scheduled to be in place for up to 6 weeks and is necessary to perform highway maintenance in the area. Gateway Operations apologizes for any inconvenience.

Updated Monday, May 16, 2016 

Road Closure: Brunswick Drive Streets:  Brunswick Drive between Waterloo Street and Prince Edward Street Date: Starting Tuesday, May 17, 2016  Duration: 3 days Direction:  Closed to thru traffic in both directions Description of work:  Infrastructure installation/upgrades  _______________________________________________________________

Beginning Monday, May 16, and for the duration of the current construction season (May-October), the City of Saint John will post all traffic advisories on a single, dedicated “Traffic Advisories” page on www.saintjohn.ca.  

Capture
We encourage citizens, including media and those who have previously received individual notifications through social media or email, to visit www.saintjohn.ca to stay informed of all City-wide traffic notifications. 

In the event of a road closure that may cause a serious or prolonged interruption to traffic, an individual notification may also be issued. 

The City’s Weekly Construction Update, which includes major road and infrastructure projects as well as work being done as part of the Safe Clean Drinking Water Project, will continue to be published on the website at the end of each week. 

Outside of construction season, traffic advisories will be issued as individual notifications.