Home > News > News Releases > Traffic Advisory: Loch Lomond Road (from Hickey Road to Bon Accord Drive)

Traffic Advisory: Loch Lomond Road (from Hickey Road to Bon Accord Drive)

10-Apr-2017

Motorists are advised of the following traffic interruptions:

Effective April 17, 2017


Streets: Loch Lomond Road from Hickey Road to Bon Accord Drive

Date: Starting Monday, April 17, 2017

Time: 7 a.m.- 9 p.m. Monday through Friday

Duration: Six (6) months

Direction: Port City Water Partners will be closing down the eastbound lane on Loch Lomond Road from Hickey Road to Bon Accord Drive.

Motorists travelling eastbound on Loch Lomond Road will be merged into the centre turning lane and the existing eastbound lane will be closed.

Motorists travelling westbound on Loch Lomond Road will not be rerouted.
On occasion, traffic will be stopped in both directions, allowing for the installation of new services.

Specific Area:
Loch Lomond Road from the intersection at Loch Lomond Road and Hickey Road through to Bon Accord Drive.

Access: Businesses within the construction zone are open and will remain accessible to the public while the work is underway. The road will also remain accessible to emergency service vehicles and local area residents.

Description of Work: Port City Water Partners will be completing construction work over the next six (6) months. This work is required to rehabilitate the existing water transmission mains, as part of the construction phase of the City of Saint John’s Safe Clean Drinking Water project.

Motorists are advised to plan their travel accordingly, reduce speeds in construction zones, observe signage, and drive safely. Work commencement and completion times are subject to change. Weather permitting.

We encourage citizens to visit www.saintjohn.ca to stay informed of all City-wide traffic notifications.